Joakim Lundvist, Modality Manager, BioProcess™ Hardware, GE Healthcare talks about large-scale buffer management challenges. Buffer preparation is known to be one of the most resource-intensive activities in biomanufacturing as large volumes of buffers and process liquids are often required. So how can this be done in a more efficient way? How can more capacity be added to buffer preparation without adding major capital investment? Are there ways to reduce the manufacturing footprint and time spent on buffers?
The podcast The Downstream Column Podcast is embedded on this page from an open RSS feed. All files, descriptions, artwork and other metadata from the RSS-feed is the property of the podcast owner and not affiliated with or validated by Podplay.